Project Specification

  • SPECIFICATION

Earthquake resistant R.C.C Frame Structure.

  • FLOORING

Ceramic tiles flooring in shopes. Vitrified tiles flooring in corridors.

  • TOILETS

Attach toilet for offices , common toilets for shops

  • ELECTRICAL

Concealed copper wiring with adequate number of points , inclusive of one three phase point in all units.

  • PARKING

Visitor parking in ground floor , allotted parking for members

  • LIFT

Branded 8 passengers automatic lift.

CONDITIONS

  • Any Change on external elevation shall be not
    permissible.
  • Possession should be given after full payment.
  • Incase of the member falling to make payment on schedule.
  • At the time of cancellation of the booking 10 % to be leave and payment shall be made only after the next available booking.
  • Legal A.E.C charges stamp duty & maintenance contribution shall be borne by the members.
  • All right are reserved by the developer & architecture for any change int the scheme.