Project Specification
- SPECIFICATION
Earthquake resistant R.C.C Frame Structure.
- FLOORING
Ceramic tiles flooring in shopes. Vitrified tiles flooring in corridors.
- TOILETS
Attach toilet for offices , common toilets for shops
- ELECTRICAL
Concealed copper wiring with adequate number of points , inclusive of one three phase point in all units.
- PARKING
Visitor parking in ground floor , allotted parking for members
- LIFT
Branded 8 passengers automatic lift.
CONDITIONS
- Any Change on external elevation shall be not
permissible.
- Possession should be given after full payment.
- Incase of the member falling to make payment on schedule.
- At the time of cancellation of the booking 10 % to be leave and payment shall be made only after the next available booking.
- Legal A.E.C charges stamp duty & maintenance contribution shall be borne by the members.
- All right are reserved by the developer & architecture for any change int the scheme.